The shoulder and right-turn lane on northbound WIS 178 are closed by barrier wall.County TT in the work zone remains closed.Location: Cobban Bridge between Jim Falls and Cornell County SS is expected to reopen to traffic next week. Traffic impacts: County SS currently is closed to through traffic from 83rd Street to County Q in the project limits, but cross traffic is being maintained at 75th Street as is access to businesses and residences on either side of bridge structures. Traffic impacts: Motorists will encounter a single-lane closure controlled by temporary signals and a maximum road width of 11 feet.ĭescription: Pulverizing and relaying the existing pavement, paving and replacing two bridges and culverts.

truck wisconsin overpass

Location: Big Drywood Creek between Cadott and Cornellĭescription: Replacing the deck, the girder on the eastern side of the bridge, guardrail and the concrete approach slabs on either side of the bridge. Traffic impacts: The road is closed and has a signed detour.

truck wisconsin overpass

Location: Yellow Lake Bridge northwest of Webster Traffic impacts: Motorists will encounter one lane of traffic with width restrictions controlled by temporary signals. Croix River Bridge west of Danburyĭescription: Making concrete surface repairs to the structure, overlaying the bridge deck with concrete, replacing wing walls, placing riprap around the piers and abutments and replacing pavement on either side of the bridge and guardrail. Location: Lee Valley Creek Bridge southwest of Gilmanton in the town of Modena Traffic impacts: The road is closed at the bridge. Location: Tiffany Creek Bridge west of Mondovi Traffic impacts: The road is closed between County BB and Alleman Road. Location: Branch Buffalo River Bridge southeast of Mondovi

truck wisconsin overpass

Traffic impacts: Motorists will encounter single-lane closures controlled by flagging in work areas. From County E East to US 2: Removing a portion of the existing pavement and placing new asphalt replacing guardrail and placing new pavement markings.

  • Flagging will be utilized as necessary on the roads underneath the bridge structures at County I and US 8.ĭescription: From Drummond Lake Road to County E East: Recycling a portion of the existing pavement and placing new asphalt over it installing rumble strips cleaning and replacing culverts replacing culvert apron end walls and curb and gutter where needed placing gravel on the shoulders and rip rap and marking the pavement.
  • The speed limit within each work zone is 60 mph.
  • Motorists can expect single-lane closures in work areas.
  • Location: Chippewa County line to US 8 near Cameronĭescription: Removing a portion of the existing asphalt overlay and placing new asphalt completing spot repairs on structures at Carlson School Road, County AA, the Chetek River, County I, Knapp Street, 20th Street and US 8 and placing a concrete overlay on each of the structures replacing the concrete deck on the structure at County A cleaning culverts and ditches replacing culvert apron end walls, guardrail, pavement markings and signage and completing spot improvements at Rest Area 34 and overlaying all concrete parking areas with asphalt. Croix, Sawyer, Taylor, Trempealeau and Washburn counties. The Wisconsin Department of Transportation (WisDOT) provides weekly updates on road construction projects in the following counties in northwest Wisconsin: Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, St.